Theme

JPS MSMA Workshop
Lesson 2: On-Site Detention, Rainwater Haversting & Submission Requirement

BEM Approved
CPD hours : 10
Ref No: (399) dlm BEM/REG/12 Jid.1

Date & Venue & Fee (Code)
August 18 & 19 JPS KL RM 800 (Normal) - 201n
RM700 (Early Bird) - 201e
RM 600 (JPS Staff) - 201j
September 8-9 JPS P.Pinang RM 800 (Normal) - 202n
RM700 (Early Bird) - 202e
RM 600 (JPS Staff) - 202j
September 29-30 JPS Johor RM 800 (Normal) - 203n
RM700 (Early Bird) - 203e
RM 600 (JPS Staff) - 203j
October 15-16 JPS Pahang RM 800 (Normal) - 204n
RM700 (Early Bird) - 204e
RM 600 (JPS Staff) - 204j
November 5-6 JPS Sabah RM 900 (Normal) - 205n
RM800 (Early Bird) - 205e
RM 700 (JPS Staff) - 205j

 

 

Intoduction

Lesson 2 modules mainly focus on the Quantity control facilities, On-site Detention (Chapter 5) and Rainwater Harvesting (Chapter 6) covered in the MSMA 2nd Edition which basically deal with control at premise level.

MSMA 2nd Edition provides simplified guidelines for the design of on-site detention (OSD) facilities. Instead of the tedious and complicated computations involved in the design of the system using Swinburne Method as shown in MSMA (2000), the simplified procedure involves only the use of tables and charts and simple computations. Depending on the land availability, OSD may be provided as above-ground storages, below-ground storages, or a combination of both within a property boundary.
Rainwater harvesting is a technique of collecting rainfall as a supplementary source of water supply for households, commercial and industrial premises, landscape watering, livestock water, and irrigation of agriculture. The planning and development of rainwater harvesting systems shall be carried out adhering to the principles and guidelines described in the workshop. The current practice by Public Works Department also will be introduced in this workshop and hands on session.

 


Programme
 

Day 1

 

8.00am - 9.00am

Registration

9.00am - 9.15am

Opening Speech

9.15am - 10.15am

Introduction of On-Site Detention (OSD)

10.15am - 10.30am

Break

10.30am - 12.00pm

OSD Design Criteria

12.00am - 1.00pm

Submission Requirement (BSMA State JPS)

1.00pm - 2.00pm

     Lunch

2.00pm - 3.30pm

Storage Tank Charateristic

3.30pm - 4.00pm

Break

4.00pm - 5.30pm

Outlet Design

5.30pm - 6.00pm

Q&A Session

 

Day 2

 

8.00am - 9.00am

   Registration

9.00am - 10.15am

Introduction to Rainwater Havesting

10.15am - 10.30am

     Break
 

10.30am - 1.00pm

     Configuration and Sizing of Storage Tank

1.00pm - 2.00pm

    Lunch 

2.00pm - 3.30pm

     Rainwater Harvesting Design (Hands On) Part 1

3.30pm - 4.00pm

     Tea Break
 

4.00pm - 5.30pm

     Rainwater Harvesting Design (Hands On) Part 2

5.30pm - 6.00pm

    Q&A session

 

 

Inquiry

CP Development
Tel: 03-5885 1250 (4 lines)  Fax: 03-5885 1251

 Email :
jpsworkshop@msowater.org / jps.msmabengkel@gmail.com

Download

Seminar Flyers & Registration Form

 

 

 

[Back]