JPS
MSMA Workshop
Lesson 2: On-Site Detention, Rainwater Haversting &
Submission Requirement
BEM
Approved
CPD hours : 10
Ref No: (399) dlm BEM/REG/12 Jid.1 |
Date & Venue & Fee
(Code) |
August 18 & 19 |
JPS KL |
RM 800
(Normal) - 201n
RM700 (Early Bird) - 201e
RM 600 (JPS Staff) - 201j |
September 8-9 |
JPS
P.Pinang |
RM 800
(Normal) - 202n
RM700 (Early Bird) - 202e
RM 600 (JPS Staff) - 202j |
September 29-30 |
JPS
Johor |
RM 800
(Normal) - 203n
RM700 (Early Bird) - 203e
RM 600 (JPS Staff) - 203j |
October 15-16 |
JPS
Pahang |
RM 800
(Normal) - 204n
RM700 (Early Bird) - 204e
RM 600 (JPS Staff) - 204j |
November 5-6 |
JPS
Sabah |
RM 900
(Normal) - 205n
RM800 (Early Bird) - 205e
RM 700 (JPS Staff) - 205j |
|
Intoduction
Lesson 2
modules mainly focus on the Quantity control facilities, On-site
Detention (Chapter 5) and Rainwater Harvesting (Chapter 6)
covered in the MSMA 2nd Edition which basically deal with
control at premise level.
MSMA 2nd Edition provides simplified guidelines for the design
of on-site detention (OSD) facilities. Instead of the tedious
and complicated computations involved in the design of the
system using Swinburne Method as shown in MSMA (2000), the
simplified procedure involves only the use of tables and charts
and simple computations. Depending on the land availability, OSD
may be provided as above-ground storages, below-ground storages,
or a combination of both within a property boundary.
Rainwater harvesting is a technique of collecting rainfall as a
supplementary source of water supply for households, commercial
and industrial premises, landscape watering, livestock water,
and irrigation of agriculture. The planning and development of
rainwater harvesting systems shall be carried out adhering to
the principles and guidelines described in the workshop. The
current practice by Public Works Department also will be
introduced in this workshop and hands on session.
Day
1
|
8.00am - 9.00am |
Registration |
9.00am - 9.15am |
Opening Speech |
9.15am - 10.15am |
Introduction of On-Site Detention (OSD) |
10.15am - 10.30am |
Break |
10.30am - 12.00pm |
OSD Design Criteria |
12.00am - 1.00pm |
Submission Requirement (BSMA State
JPS) |
1.00pm - 2.00pm |
Lunch |
2.00pm - 3.30pm |
Storage Tank Charateristic |
3.30pm - 4.00pm |
Break |
4.00pm - 5.30pm |
Outlet Design |
5.30pm - 6.00pm |
Q&A Session |
Day
2
|
8.00am - 9.00am |
Registration |
9.00am - 10.15am |
Introduction to Rainwater Havesting |
10.15am - 10.30am |
Break
|
10.30am - 1.00pm |
Configuration and Sizing of Storage Tank |
1.00pm - 2.00pm |
Lunch |
2.00pm - 3.30pm |
Rainwater
Harvesting Design (Hands On) Part 1 |
3.30pm - 4.00pm |
Tea
Break
|
4.00pm - 5.30pm |
Rainwater
Harvesting Design (Hands On) Part 2 |
5.30pm - 6.00pm |
Q&A session |
CP Development