Photo Album

Floodrisk Mapping for Pari River

Flood plain survey 

Date : 14th July 2002 - 19th July 2002

 
 

Pari River TBM 38.581.m Preparation for Survey- Shanker & Paker Mohd Silibin Bridge Stage Gauge at Silibin Bridge Dr. Sanussi S. Ahamad calibrating the EDM unit

 

Silibin Bridge Setting the Bearing First Garden EDM using Top Corn Chang Chun Kiat calibrating the EDM unit Pari River

 

Sand Dredging at Pari River Buntong Buntong Silibin Bridge Buntong Floodplain Buntong Floodplain

 

         
Buntong Floodplain      

Date : 31st March - 5th April 2003

 

 

 
Sungai Pari Secondary School Sungai Pari Secondary School Buntong KTM Village, Falim Buntong Railway Bridge  

[Back]

Last Updated: 18th Nov 2004