Photo Album |
|||||
Floodrisk Mapping for Pari River Flood plain survey Date : 14th July 2002 - 19th July 2002 |
|||||
|
|||||
Pari River | TBM 38.581.m | Preparation for Survey- Shanker & Paker Mohd | Silibin Bridge | Stage Gauge at Silibin Bridge | Dr. Sanussi S. Ahamad calibrating the EDM unit |
|
|||||
Silibin Bridge | Setting the Bearing | First Garden | EDM using Top Corn | Chang Chun Kiat calibrating the EDM unit | Pari River |
|
|||||
Sand Dredging at Pari River | Buntong | Buntong | Silibin Bridge | Buntong Floodplain | Buntong Floodplain |
|
|||||
Buntong Floodplain | |||||
Date : 31st March - 5th April 2003 |
|||||
|
|||||
|
|
|
|
|
|
Sungai Pari Secondary School | Sungai Pari Secondary School | Buntong | KTM Village, Falim | Buntong Railway Bridge | |
[Back] |
Last Updated: 18th Nov 2004