List of Consultancy
TAHUN 2023
EFFICACY OF ASTAREAL® ASTAXANTIN FOR THE AMELIORATION OF DIGITAL EYE STRAIN IN SCHOOL AGE CHILDREN: A RANDOMIZED, DOUBLE-BLIND, PLACEBO-CONTROLLED HUMAN CLINICAL TRIAL
Type : Consultancy
Funder/Client : AstraReal Pte. Ltd., Singapore
Duration : 1 Jan 2023 – 31 Dec 2025
Consultancy Costs : RM 126,627.6
WEST COAST EXPRESSWAY FOR SECTION 2 SCOPE OF WORKS HYDROLOGY AND HYDRAULIC ANALYSIS FOR SUNGAI AIR HITAM
Type : Consultancy
Funder/Client : Prebore Piling & Engineering Sdn Bhd
Duration : 1 Apr 2023 – 25 May 2023
Consultancy Costs : RM 26,500.00
CARRY OUT ENGINNERING STUDY USING CFD MODEL TO SIMULATE THE CLOSURE OF EMERGENCY GATE
Type : Consultancy
Funder/Client : EAST AUTOMATION & ENGINEERING SDN. BHD.
Duration : 2 Feb 2023 – 2 April 2023
Consultancy Costs : RM5,810.00
TAHUN 2022
MEMANTAU KEADAAN KUALITI AIR (WATER QUALITY) SUNGAI MAK MANDIN, SUNGAI KEREH DAN SUNGAI BAGAN LALANG DI DAERAH SEBERANG PERAI UTARA
Type : Consultancy
Funder/Client : FALLAH CALIPH SDN.BHD.
Duration : 1 September 2022 – 30 May 2023
Consultancy Costs : RM 26,500.00
CIVIL AND STRUCTURAL SUBCONSULTANCY SERVICES FOR THE PROPOSED CONSTRUCTION AND COMPLETION OF COMMON INFRASTRUCTURE WORKS AT KWASA DAMANSARA TOWNSHIP DEVELOPMENT IN MBSA AREA, SELANGOR DARUL EHSAN
Type : Consultancy (Civil Engineering)
Funder/Client : Kemasepakat Sdn. Bhd.
Duration : 1 June 2022 – 30 May 2027
Consultancy Costs : RM 50,000.00
PELAN PENGURUSAN LEMBANGAN SUNGAI BERSEPADU (IRBM) LEMBANGAN SUNGAI KLANG (2022-2030) DAN LAPORAN STATE OF RIVER REPORT (SOR) LEMBANGAN SUNGAI KLANG 2020 BAGI LEMBAGA URUS AIR SELANGOR, SELANGOR
Type : Consultancy (Civil Engineering)
Funder/Client : Lembaga Urus Air Selangor
Duration : 1 April 2022 – July 2023
Consultancy Costs : RM 591,480.00
PERKHIDMATAN PENGAMBILAN DAN PENYUNTINGAN GAMBAR BAGI KEPERLUAN PIHAK NAHRIM UNTUK PENYEDIAAN COFFEE TABLE BOOK YANG BERTAJUK SISTEM TANAH BENCAH BUATAN SEBAGAI ALTERNATIF KEPADA SISTEM PEMBETUNGAN
Type : Consultancy
Funder/Client : NAHRIM
Duration : 1 May 2022 – 30 October 2022
Consultancy Costs : RM 56,456.20
PERKHIDMATAN PERUNDING UNTUK REKABENTUK TERPERINCI BAGI PEMBANGUNAN LEMBANGAN SUNGAI BERSEPADU SUNGAI KUANTAN-LIVING RIVER SUNGAI GALING, KUANTAN, PAHANG (SKOP WETLAND)
Type : Consultancy
Funder/Client : Tanahasia Consulting Engineers Sdn Bhd
Duration : 1 July 2022 – 31 Jan 2023
Consultancy Costs : RM 40,000.00
PERKHIDMATAN KEPAKARAN TEKNIKAL BAGI PENGUMPULAN MAKLUMAT DAN DATA TAPAK EROSION PLOT DI KAWASAN PENGUMPULAN KHAS
Type : Consultancy
Funder/Client : Jabatan Pertanian Malaysia
Duration : 1 September 2022 – 28 Februaty 2023
Consultancy Costs : RM 19,500.00
PERKHIDMATAN BANTUAN TEKNIKAL PENYELIDIKAN BAGINPEMETAAN SEMPADAN DAN PERSAMPELAN TANAH DI KAWASAN KAJIAN SPECIAL MANAGEMENT AREA (SMA) DAN KAWASAN PROJEK PERINTIS DI LOJING, KELANTAN
Type : Consultancy
Funder/Client : Jabatan Pertanian Malaysia
Duration : 1 July 2022 – 29 September 2022
Consultancy Costs : RM 19,800.00
"CFD SIMULATION FOR THE CLOSURE OF EMERGENCY GATE AT TAWAU DAM”
Type : Consultancy
Funder/Client : Aquatiu Engineering Consultants
Duration : 15 Nov 2022 – 15 Jan 2023
Consultancy Costs : RM 20,352.00
PERKHIDMATAN MENJALANKAN KERJA KERJA PERKHIDMATAN KEPAKARAN BAGI PENGUMPULAN MAKLUMAT DAN DATA KAJIANTAPAK DI KAWASAN SENSITIF BAGI ZON UTARA
Type : Consultancy
Funder/Client : Jabatan Pertanian Malaysia
Duration :12 October 2022 – 11 March 2023
Consultancy Costs : RM 8,723.76
KAJIAN KEMUNGKINAN PEMBANGUNAN RIVER HEALTH INDEX (RHI) BAGI LEMBANGAN SUNGAI DI MALAYSIA
Type : Contract Research
Funder/Client : JPS MALAYSIA
Duration : 08 October 2022 – 18 August 2023
Consultancy Costs : RM 488,605.94
"COOLING WATER PUMP SUMP HYDRAULIC PHYSICAL MODEL AND NUMERICAL SIMULATIONS"
Type : Consultancy
Funder/Client : Spark Engineering Sdn Bhd
Duration : 1 September 2022 – 31 Dec 2022
Consultancy Costs : RM 65,000.00
TAHUN 2021
PERMOHONAN KEBENARAN MERANCANG UNTUK CANDANGAN MENDIRIKAN SKIM PERUMAHAN MAMPU MILIK SECARA SERENTAK DENGAN PERMOHONAN PENYERAHAN DAN PEMBERIMILIKAN SEMULA MENGIKUT SEKYEN 204D KANUN TANAH NEGARA, DIATAS LOT 1547, MUKIM 11, DAERAH SEBERANG PERAI UTARA, NEGERI PULAU PINANG
Type : Consultancy (Civil Engineering)
Funder/Client : Perunding Pinang SDN BHD
Duration : 21 December 2021 – 28 February 2022
Consultancy Costs : RM 85,000.00
Sub-Consultancy Services for Flood Mitigation Hydraulic Specialist & GIS Expert for Rekabentuk Teperinci Rancangan Tebatan Banjir Teluk Bahang Daerah Barat Day, Pulau Pinang for Messrs, JPS Malaysia
Type : Consultancy (Civil Engineering)
Funder/Client : M.E.I Consultants Sdn. Bhd
Duration : 1 April 2021 – 30 May 2022
Consultancy Costs : RM 85,000.00
PERKHIDMATAN PERUNDINGAN BAGI KEBOLEHLAKSANAAN WATER RECLAMATION PLANT (WRP) DI DAERAH PASIR GUDANG, JOHOR DARUL TAKZIM
Type : Consultancy (Civil Engineering)
Funder/Client : Sepakat Setia Perunding (Sdn) Bhd.
Duration : 5 April 2021 – 30 May 2022
Consultancy Costs : RM 8,000.00
ON-SITE SOIL INFILTRATION TEST SERVICES FOR THE PROPOSED PHASE 2 MANUFACTURING FACILITIES ON PLOT P304C, LINGKARAN CASSIA SELATAN, BATU KAWAN INDUSTRIAL PARK, PENANG, B.L. TAY ARCHITECT (ON BEHALF OF MICRON MEMORY MALAYSIA)
Type : Consultancy (Civil Engineering)
Funder/Client : B.L. Tay Architect
Duration : 1 April 2021 – 30 May 2021
Consultancy Costs : RM 7,685.00
TECHNICAL ADVISORY SERVICES (TECHNICAL CONSULTANT)
Type : Consultancy (Civil Engineering)
Funder/Client : TG Ocean Helth Food Industries Sdn Bhd
Duration : 1 April 2021 – 30 May 2021
Consultancy Costs : RM 228,960.00
RESEARCH ON CURRENT PROFILING USING ADCP AS PART FOR EIA SUBMISSION TO DEPARTMENT OF ENVIRONMENT KEDAH FOR PROPOSED PRAWN FARM CONSISTING OF OPEN SHED WAREHOUSE AND SUPPORT BUILDINGS ON LOT 1580, 1581 & 1777, JALAN TANJUNG DAWAI, MUKIM MERBOK, DAERAH KUALA MUDA, KEDAH DARUL AMAN
Type : Research Contract
Funder/Client : Kamaruddin Harun Consultants Sdn Bhd
Duration : 15 April 2021 – 14 April 2022
Consultancy Costs : RM 18,000.00
KAJIAN OPSYEN PELEPASAN EFLUEN TERAWAT DI PROJEK LOJI RAWATAN KUMBAHAN SERANTAU DI PAPAN, DAERAH KINTA BARAT
Type : Research Contract
Funder/Client : Tanahasia Consulting Engineers Sdn Bhd
Duration : 10 August 2021 – 10 December 2021
Consultancy Costs : RM 30,000.00
MENGKAJI STATUS KUALITI AIR PEMBUANGAN EFLUEN LADANG BABI DI KAMPUNG SELAMAT DAN SUNGAI KEREH DARI SEGI INDEKS KUALITI AIR
Type : Research Contract
Funder/Client : Jabatan Veterinar Negeri Pulau Pinang
Duration : 10 August 2021 – 10 December 2021
Consultancy Costs : RM 60,000.00
MEREKA, MENJALANKAN DAN MENYELIA KAJIAN PERCUBAAN KLINIKAL UNTUK PESAKIT METABOLIK SINDROM MENGGUNAKAN PRODUK SUPLIMEN TOCOOAT
Type : Research Contract
Funder/Client : Gold Choice Food Industries Sdn Bhd
Duration : 1 May 2021 – 30 April 2021
Consultancy Costs : RM 144,261.76
ANALISIS TABURAN ENDAPAN DI EMPANGAN MUDA DAN PEDU
Type : Research Contract
Funder/Client : NAHRIM
Duration : 21 September 2021 – 30 November 2021
Consultancy Costs : RM 19,500.00
CADANGAN KAJIAN KEBOLEHLAKSANAAN MEMBAIKPULIH KOLAM REKREASI DI TAMAN REKREASI DR SEENIVASAGAM OFF JALAN RAJA MUSA AZIZ IPOH, PERAK
Type : Research Contract
Funder/Client : Majlis Bandaraya Ipoh (MBI)
Duration : 1 September 2021 – 6 October 2021
Consultancy Costs : RM 84,496.00
TAHUN 2020
PELAKSANAAN KAJIAN PELAN INDUK SISTEM PEMPARITAN DI TAMAN PERINDUSTRIAN BATU KAWAN 2 (BKIP 2), BYRAM, MUKIM 11, DAERAH SEBERANG PERAI SELATAN PULAU PINANG
Type : Consultancy (Civil Engineering)
Funder/Client : Perbadanan Pembangunan Pulau Pinang (PDC)
Duration : June 2020 – December 2020
Consultancy Costs : RM 728,818.90
SITE SUPERVISORY STAFF FOR DRAINAGE WORKS
Type : Consultancy (Civil Engineering)
Funder/Client : Perunding Hashim & NEH Sdn Bhd
Duration : June 2020 – January 2021
Consultancy Costs : RM 728,818.90
SUB-CONSULTANCY SERVICES FOR FLOOD MITIGATION HYDRAULIC SPECIALIST & GIS EXPERT FOR REKABENTUK TEPERINCI RANCANGAN TEBATAN BANJIR TELUK BAHANG DAERAH BARAT DAY, PULAU PINANG FOR MESSRS, JPS MALAYSIA
Type : Consultancy (Civil Engineering)
Funder/Client : M.E.I Consultants Sdn. Bhd
Duration : March 2020 – May 2021
Consultancy Costs : RM 85,000.00
RIVER SEDIMENT DATA COLLECTION & CROSS SECTIONPROFILING AT SUNGAI JURU
Type : Consultancy (Civil Engineering)
Funder/Client : Kotani Engineering Consultant Sdn Bhd
Duration : February 2020 – February 2021
Consultancy Costs : RM 10,000.00
PERLAKSANAAN KAJIAN PELAN INDUK SISTEM PERPARITAN UNTUK PENANG SCIENCE PARK SOUTH (PSPS) & EAST BATU KAWAN (EBK)
Type : Consultancy (Civil Engineering)
Funder/Client : Perbadanan Pembangunan Pulau Pinang (PDC)
Duration : January 2020 – July 2020
Consultancy Costs : RM 488,787.00
EFFICACY OF LOW GLAYCEMIC INDEX INSTANT MULTIGRAIN SUPPLEMENT IN TYPE II DIABETES MELLITUS: A RANDOMIZED, OPEN-LABELLED INTERVENTION TRAIL
Type : Research Contract
Funder/Client : TG Ocean Health Food Industries Sdn. Bhd.
Duration : January 2020 – December 2020
Consultancy Costs : RM 90,156.00
EFFICACY OF SEA BUCKTHORN OIL SUPPLEMENTATION AMONG THE 3HS (HYPERLIPIDEMIA AND HIGH BLOOD SUGAR) PATIENTS: A RANDOMIZED HUMAN CLINICAL
Type : Research Contract
Funder/Client : Orient Biotech Sdn. Bhd., Malaysia,
Duration : January 2020 – December 2021
Consultancy Costs : RM 585,280.00
TAHUN 2019
PERKHIDMATAN PENYEDIAAN PELAN PENGURUSAN LEMBARAN SUNGAI BERSEPADU (IRBM) SUNGAI JURU, PULAU PINANG (EROSIAN & SEDIMENT SPECIALIST)
Type : Consultancy
Funder/Client : River Net Consulting Sdn. Bhd
Duration : November 2019– January 2020
Consultancy Costs : RM 23,584.91
CADANGAN MENDIRIKAN SEBUAH KLINIK KESIHATAN JENIS 2 BANDAR PERDA DI ATAS PT 2959, MUKIM 06, DAERAH SEBERANG PERAI TENGAH,PULAU PINANG
Type : Consultancy
Funder/Client : Takdir Permai
Duration : October 2019– May 2020
Consultancy Costs : RM 38,500.00
CADANGAN PEMBINAAN IBU PEJABAT POLIS DAERAH (IPD) PASIR MAS DI ATAS LOT 1155 MUKIM GUA, DAERAH PASIR MAS, KELANTAN DARUL NAIM. -SURAT LANTIKAN MEMBERI LATIHAN DAN BANTUAN TEKNIKAL UNTUK PEMBINAAN SISTEM SALIRAN DI TAPAK PROJEK
Type : Consultancy
Funder/Client : Mansashi Sdn Bhd
Duration : February 2019– June 2019
Consultancy Costs : RM 45,000.00
TAHUN 2018
TECHNICAL ADVISORY SERVICE
Type : Research Contract
Funder/Client : TG Ocean Health Food Industries Sdn. Bhd
Duration : October 2018 – October 2021
Consultancy Costs : RM 228,960.00
CLINICAL STUDY ENTITLED “EFFECTIVENESS OF MULTIGRAINENRICHED POWDER SUPPLEMENTATION AMONG THE RHEUMATOID ARTHRITIS (RA) PATIENT: AN OPEN-LABEL CLINICAL TRIAL”
Type : Research Contract
Funder/Client : TG Ocean Health Food Industries Sdn. Bhd
Duration : July 2018 – October 2021
Consultancy Costs : RM 161,120.00
PROPOSED CONSTRUCTION AND COMPLETION OF COMMON INFRASTRUCTURE WORKS AT SOUTHERN AREA UNDER MAJLIS BANDARAYA PETALING JAYA JURISDICTION OF KWASA DAMANSARA TOWNSHIP
Type : Consultancy
Funder/Client : DNP Consult Sdn. Bhd.
Duration : March 2018 – March 2020
Consultancy Costs : RM 1,500,000.00
TAHUN 2017
PENYEDIAAN PELAN PENGURUSAN LEMBANGAN SUNGAI BERSEPADU (IRBM), SUNGAI PERAI, PULAU PINANG/KEDAH
Type : Research Contract
Funder/Client : Department of Irrigation and Drainage (DID)
Duration : December 2017 – June 2019
Consultancy Costs : RM 1,721,281.00
CADANGAN MENINGKATKAN TARAF KAPASITI SIMPANAN AIR BAGI EMPANGAN SUNGAI CHEROK, COMPUTATIONAL MODELING FOR EMERGENCY GATES - PART 2
Type : Research Contract
Funder/Client : TFL Engineering Sdn. Bhd.
Duration : April 2017 – May 2017
Consultancy Costs : RM 4,982.00
CADANGAN UNTUK MENDALAMKAN DAN MENGELUARKAN PASIR DI MUARA SUNGAI DAN SUNGAI MUDA DI NEGERI KEDAH DARUL AMAN
Type : Consultancy
Funder/Client : Mahligai Seni Komunikasi Sdn. Bhd.
Duration : February 2017 – March 2017
Consultancy Costs : RM 60,000.00
KERJA-KERJA MENAIKTARAF PADANG SEKOLAH FRANCIS LIGHT
Type : Consultancy
Funder/Client : SKD Zaman Sdn. Bhd.
Duration : February 2017 – August 2017
Consultancy Costs : RM 20,000.00
TECHNICAL AND FINANCIAL MANAGER FOR THE 37TH IAHR WORLD CONGRESS AND INTERNATIONAL WORKSHOP ON STORMWATER AND RIVER MANAGEMENT, KUALA LUMPUR, 13-18 AUGUST, 2017
Type : Consultancy
Funder/Client : International Association for Hydro-Environment Engineering and
Research (IAHR)
Duration : January 2017 – Disember 2017
Consultancy Costs : RM 3,305,985.1
TAHUN 2016
"PROPOSED OF DEVELOPMENT OF RUBBER RESEARCH INSTITUTE OF MALAYSIA (RRIM) LAND AT SUNGAI BULOH, DISTRICT OF PETALING, SELANGOR DARUL EHSAN FOR KWASA LAND SDN BHD – EMPLOYMENT OF BIOECODS ARE"
Type : Consultancy
Funder/Client : Perunding Hashim & NEH Sdn Bhd
Duration : February 2016 – June 2020
Consultancy Costs : RM 579,500.00
TECHNICAL ADVISORY FOR DRAINAGE WORKS FOR THE PROPOSED DEVELOPMENT OF RUBBER RESEARCH INSTITUTE OF MALAYSIA (RRIM) LAND AT SUNGAI BULOH, DISTRICT OF PETALING JAYA, SELANGOR DARUL EHSAN FOR KWASA LAND SDN. BHD.
Type : Consultancy
Funder/Client : SKD Zaman Sdn. Bhd.
Duration : February 2016 – February 2018
Consultancy Costs : RM 20,000.00
PROFESSIONAL CONFERENCE ORGANIZER FOR THE 37TH IAHR WORLD CONGRESS AND WORKSHOP ON STORMWATER AND RIVER MANAGEMENT
Type : Consultancy
Funder/Client : The International Association for Hydro-Environment Engineering and
Research (IAHR)
Duration : August 2016 – August 2017
Consultancy Costs : RM 568,000.00
INTERGATED SUSTAINABLE LIVING (ISL) DEVELOPMENT ISKANDAR MALAYSIA, JOHOR DARUL TAKZIM
Type : Consultancy
Funder/Client : AJM-Planning and Urban Design Group Sdn. Bhd
Duration : August 2016 – July 2017
Consultancy Costs : RM 100,000.00
DESIGN OF STORMWATER MANAGEMENT FACILITIES IN KULIM HI-TECH FOR JPS MALAYSIA: PHASE 2
Type : Research Contract
Funder/Client : Abadini Integras Engineers Sdn. Bhd.
Duration : January 2016 – February 2016
Consultancy Costs : RM 21,671.00
DETAILED DESIGN OF STORMWATER MANAGEMENT FACILITIES IN SUNGAI BULUH
Type : Research Contract
Funder/Client : Abadini Integras Engineers Sdn. Bhd.
Duration : January 2016 – February 2016
Consultancy Costs : RM 19,200.00
COMPUTATIONAL MODELING FOR EMERGENCY GATES
Type : Research Contract
Funder/Client : TFL Engineering Sdn. Bhd.
Duration : November 2016 – December 2016
Consultancy Costs : RM 10,086.96
CADANGAN MENAIKTARAF SISTEM PERPARITAN DI KAWASAN PERINDUSTRIAN KUALA KETIL, KEDAH DARUL AMAN
Type : Consultancy
Funder/Client : Muda Watan (M) Sdn. Bhd.
Duration : April 2016 – July 2016
Consultancy Costs : RM 10,086.96
PROPOSED REVIEW OF STORMWATER MANAGEMENT MASTERPLAN TO SUIT THE LOW LYING DEVELOPMENT AREA BASED ON GREEN INFRASTRUCTURE FOR COMMERCIAL HUB AT BANDAR RIMBAYU DEVELOPMENT AT TELOK PANGLIMA GARANG, MUKIM TANJUNG DUA BELAS, DAERAH KUALA LANGAT, SELANGOR
Type : Consultancy
Funder/Client : Bandar Rimbayu Sdn. Bhd.
Duration : January 2016 – December 2016
Consultancy Costs : RM 280,400.00
Tahun 2015
FEASIBILITY STUDY TO SOLVE FLOOD PROBLEM AT UMK'S KAMPUS KOTA
Type : Research Contract
Funder/Client : Universiti Sains Malaysia (USM)
Duration : February 2015 – 30 September 2015
Consultancy Costs : RM 75,000.00
CADANGAN PEMBANGUNAN BERCAMPUR DI ATAS PT 1519, PT 1520 DAN PT 4068 SELUAS 541 EKAR MUKIM BERIAH, DAERAH KERIAN, PERAK DARUL RIDZUAN
Type : Consultancy
Funder/Client : DPI Konsult Sdn. Bhd.
Duration : July 2015– July 2017
Consultancy Costs : RM 20,000.00
ECO FRIENDLY WATER QUALITY IMPROVEMENT WORKS FOR SG. BATU FERRINGHI AND SG. SATU
Type : Consultancy
Funder/Client : Department of Irrigation and Drainage (DID) Malaysia
Duration : February 2015 - June 2017
Consultancy Costs : RM 223,289.80
CADANGAN MENAIKTARAF PADANG DAN SISTEM SALIRAN BAWAH TANAH DI PADANG MRSM BENTONG, PAHANG UNTUK TETUAN JKR
Type : Consultancy
Funder/Client : Universiti Sains Malaysia (USM)
Duration : January 2015 - March 2015
Consultancy Costs : RM 9,400.00
FEASIBILITY STUDY OF STORMWATER MANAGEMENT TO OVERCOME FLOODING PROBLEMS AT UNIVERSITI MALAYSIA KELANTAN ( ) KAMPUS KOTA, KELANTAN DARUL NAIM
Type : Consultancy
Funder/Client : Universiti Sains Malaysia (USM)
Duration : January 2015 - May 2015
Consultancy Costs : RM 180,000.00